Entre Ríos
Salto Grande's Soviet turbine overhaul fuels a new clash between the Nation and Entre Ríos
The 14 turbines manufactured in the USSR that operate at the binational dam have turned 47 years old and need to be replaced. Each unit costs about US$ 50 million. In parallel, Entre Ríos is preparing a lawsuit against the Nation over differences in energy pricing.